Embarking on the journey to install an inground pool is an exciting venture that promises endless relaxation and fun. However, one of the first questions that springs to mind is, “How long does it take to install an inground pool?” The answer isn’t straightforward, as several factors include the type of inground pool, the time of year, and required permits.
At Neave Group, we understand the anticipation of wanting to dive into your new, shiny, perfect pool, and we’re here to guide you through the timeline, ensuring a smooth and efficient process from having the pool installed to learning about aftercare and pool equipment to your first swim.
Understanding the Pool Installation Timeline
A pool building timeline for installing an in-ground pool typically spans 8 to 12 weeks, but it’s essential to understand that this is a flexible estimate. Various factors can influence the duration of the pool-building process. Here, we break down these factors to give you a clearer picture of what to expect.
Initial Consultation and Pool Design (1-2 Weeks)
The first step in your pool installation journey begins with a consultation and pool design process. During this time, you’ll meet with a Neave Group pool designer to discuss your vision, preferences, and requirements for your new pool. Our designers take this opportunity to suggest materials, features, and straightforward pool designs that align with your desires and budget. This collaborative planning process ensures that the final design perfectly reflects your dream pool. Typically, this phase of the pool building process is completed within one to two weeks, depending on the complexity of your pool project and how quickly decisions are made.
Permit Acquisition (2-6 Weeks)
Once the design is finalized, obtaining the necessary permits is the next hurdle. The duration of this phase can vary significantly based on your local municipality’s requirements. Some areas offer quick approvals within two weeks, while others may require multiple approvals, attendance at planning board meetings, or additional input from engineers and pool contractors, extending the process to up to six months. Neave Group leverages its extensive experience and local knowledge to navigate this process as efficiently as possible, aiming to minimize delays.
Excavation and Preparation (1-2 Weeks)
With permits in hand, the next step is breaking ground. Excavation is a critical phase where the site is prepared for the pool installation. This process usually takes about a week but can extend to two weeks, depending on the size of the pool, soil conditions, and accessibility of the site. Neave Group’s skilled pool contractor team ensures this phase is carried out precisely and carefully, setting a solid foundation for the rest of the pool project.
Pool Construction Process (3-8 Weeks)
The pool construction phase duration varies based on the type of pool you’ve chosen:
Finishing Touches (1-4 Weeks)
The final stage of the pool building timeline involves adding the finishing touches, such as landscaping, lighting, pool structures, and water features like waterfalls or spas. Depending on the complexity and scale of the finishing work, this phase can take anywhere from one to four weeks.
At Neave Group, we understand that time is of the essence. Our team works diligently to ensure that each phase of the pool installation process is completed efficiently without compromising on the quality of artistry or materials. We’re committed to keeping you informed and involved every step of the way, ensuring that your pool installation experience is as enjoyable and stress-free as possible.
Types of Pools and Their Installation Timelines
When choosing the material for your inground pool, it’s essential to understand the installation timelines and the reasons behind these durations. Each material has unique characteristics influencing the installation process and the required completion time. Here’s a closer look at what goes into installing vinyl-liner, fiberglass, and concrete pools and why each material demands a specific timeframe.
The Neave Group Difference When it Comes to Pool Construction and Installation
At Neave Group, we don’t just build pools; we create personalized backyard oases. Our process begins with a detailed design consultation, during which we listen to your dreams and aspirations for your pool. We then guide you through the permitting maze, leveraging our local expertise in the counties we serve in New York and Connecticut to avoid unnecessary delays. Our skilled team, equipped with the best materials and techniques, ensures that the installation is seamless and efficient whether you choose a vinyl liner, fiberglass, or concrete pool.
Our holistic approach extends beyond the pool. We incorporate landscaping and patio construction into our pool projects, transforming your backyard into a stunning retreat. With Neave Group, you get a pool and a comprehensive backyard solution tailored to your lifestyle and preferences. Contact us today to see what we can do for you.